200KW PV MOUNTING Quick installation bracket system

04-03-2021


200KW  PV MOUNTING  Quick installation  system


In just 3 days, from the foundation of the support, the roof support to the end of the module installation, the installation of a photovoltaic power station with a concrete roof installed capacity of 200KW was completed. The previous similar roofing power stations require at least 7 days of construction time to complete. What brings such efficient and rapid construction efficiency is relying on the Quick rapid installation bracket system.



The traditional concrete roof support foundation mounting structure construction requires a lot of manpower and material resources. From the beginning of the production of concrete formwork, to concrete mixing and transportation, making support embedded parts, making and shaping the concrete foundation, foundation maintenance, demoulding, foundation transportation, etc. For a series of procedures, the entire process takes at least 7 days. In the case of rain and snow, the cycle will be longer, a lot of labor costs will be invested, and the construction quality will also be affected.


The Quick installation PV mounting system can well overcome the above difficulties. The foundation and photovoltaic brackets can be installed and debugged when they arrive, and only a certain amount of small stones need to be filled in the Quick basic box. The construction period and labor cost can be greatly saved, and it is not affected by the weather, which is very suitable for the installation of small and medium-sized photovoltaic power plants.

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy