Solar Clamps

  • Solar Clamps
  • Solar Clamps
  • Solar Clamps
  • Solar Clamps
  • Solar Clamps
  • Solar Clamps
  • video
Solar Clamps
  • Starwin
  • China
  • 14days
  • 50000pcs per week

Aluminium Solar Panel Mount Mid clamps & end clamps are used to fix solar modules to rails.
Starwin solar is wholesale solar racking from China

whether you need mounting clamps for the framed or unframed panels for PV mounting clamps,
we can provide all of them. solar middle clamps &end clamps always fit perfectly to the different kinds of solar modules and PV mounting structures.
PV solar panel mounting clamps, solar mounting clamps are made of anodized aluminum with the quality of corrosion-resistance and strong intensity. It can be used for different PV kits and different PV arrangements which can be interchange randomly.


Starwin solar is wholesale solar racking from China

Starwin solar  provides solar mid clamps & end clamps for solar mounting structure.which are made of extruded anodized aluminium with 35mm/40mm/45mm/50mm length.and with accurate design, the mid clamp can make the connection between the panel  firmly. Aluminium framed panel clamps for fixing panel on the rails.


Solar panel mid clamps &end clamps also welcomed by most of solar installers, solar distributors&solar EPC company, we can provide customized with OEM Service if you need



Material: Aluminum 6005-T5.

Specification: 35-50mm length, customized.

Color: Natural or black anodized.

Installation site: Solar mounting rails.

Wind Speed : 60m/s.

Warranty:12 years warranty, 25 years life time.

Packing:75-130 pcs for one carton.


solar fastening system clamps is suitable for all types and brands of solar panels. Resistant, they can withstand high temperature variations and overload without being damaged. Lightweight and easy to install .

wholesale solar racking from China

Requirements to design and quote 


1) solar panel datasheet (L x W x T)

2) planed layout: ___row X ___nos modules

3) tile angle

4) roof type:  metal or tile or concrete

5) orientation of solar panel: portrait or landscape

6) wind load and snow load


 


Why Choose US


·    Design conformable to different on-roof project requirements


·    Fast and cost effective installation, easy to be assembled on different roof tops


·    Short in 7 days leading time


·    Wisely solutions for your solar PV projects


 


FAQ


Q  :  Can I have a sample order ?


A  :   Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.


Q  :  What about the lead time?


A  :  Sample needs 3-5 days, mass production time needs 10~20 days for order quantity more than. 


Q  :  Do you have any MOQ limit ?


A  :  For normal products,we provide low MOQ, 1pc for sample checking is available.


Q  :  How do you ship the goods and how long does it take to arrive?


A  :  For small products,we usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-7 days to arrive. For big orders,we usually ship by sea,it will take 7~30days to arrive, depend on distance.


Q  :  How to proceed an orders?


A  :  Firstly let us know your requirements or application.Secondly We quote according to your requirements or our suggestions.Thirdly customer confirms the samples and places deposit for formal order. 


Q  :  Is it OK to print my logo on products?


A  :   Yes. Please inform us formally before our production and confirm the design firstly based on our sample.


Q  :  Do you offer guarantee for the products?


A  :   Yes, we offer 10 years to solar mounting system.



Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right