• aluminum solar Kliploks for metal roofs
  • aluminum solar Kliploks for metal roofs
  • aluminum solar Kliploks for metal roofs
  • aluminum solar Kliploks for metal roofs
  • aluminum solar Kliploks for metal roofs
  • aluminum solar Kliploks for metal roofs
  • video

aluminum solar Kliploks for metal roofs

  • Starwin
  • Zhangzhou
  • 14days
  • 30MW/Month
Traditional solar mounts require drilling through the metal roof panel to hit the structural purlin underneath. Each hole is a potential future leak, a point of corrosion, and a violation of many roofing manufacturers' warranties. Aluminum Kliplok systems fundamentally reject this approach.

aluminum solar Kliploks for metal roofs

aluminum Kliploks

Kliploks are non-penetrating aluminum clamps designed to mount solar rails directly onto the raised ribs of trapezoidal metal roofs (like the Kliplok 406 profile). They grip the roof's seam mechanically—no drilling through the weatherproof sheet. This preserves the roof's integrity, prevents leaks, and typically keeps the roofing warranty intact.

How They Work:

A two-part clamp assembly wraps around the roof rib.

when torqued to specification, it creates a vice-like grip that resists wind uplift.

A mounting bracket attaches to the clamp, holding the aluminum rail that carries the solar panels.

Fast Installation: No drilling, sealing, or purlin hunting for each point.

Removable: The entire system can be disassembled for roof maintenance or array reconfiguration.

Roof Condition: The roof must be structurally sound, with adequate sheet thickness (typically ≥0.4mm BMT) and no corrosion.

metal roof kliplok solar mountingkliplok roof solar mount

Metal roof Kliploks are the professional's choice for a fast, secure, and watertight solar installation on trapezoidal ribbed metal roofs. Their success hinges on precision: precise profile matching, precise engineering, and precise installation torque. When done correctly, they provide a worry-free foundation for a decades-long solar asset.

FAQ

Q  :  Can I have a sample order ?

A  :   Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.

Q  :  What about the lead time?

A  :  Sample needs 7-10 days, mass production time needs 10~20 days 

Q  :  Do you have any MOQ limit ?

A  :  For normal products,we provide low MOQ, 1pc for sample checking is available.
Q  :  How do you ship the goods and how long does it take to arrive?

A  :  For small products,we usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-7 days to arrive. For big orders,we usually ship by sea,it will take 7~30days to arrive, depend on distance.

Q  :  How to proceed an orders?

A  :  Firstly let us know your requirements or application.Secondly We quote according to your requirements or our suggestions.Thirdly customer confirms the samples and places deposit for formal order.


Q  :  Do you offer guarantee for the products?

A  :   Yes, we offer 10 years to solar mounting system.




Related Products

Get the latest price? We will reply as soon as possible (within 12 hours)